Tuesday, June 02, 2009

Dinghy Day Four







Well today I managed to get the dinghy stitched and taped. If working alone, then stitching is the only way to hold the thing together, but it is more work in the end as the stitches will need to be removed. I would recommend just taping the thing together with the aid of a few well placed screws; this requires a second person though. It will produce less work in the end as filleting around stitches is a pain.

I managed to finish filleting and taping half the boat with the help of a very interested 23 year old gardner. He wanted me to show him this new stitching technique and I let him muck in. The result are rather messy fillets, but hey, this is designed to get me sailing and not a work of art. If I can show locals a few new skills on the way so much the better.

The slow tropical hardner is not that slow. Three mixed pots exothermed in just a few minutes. I suppose over 30 degree heat and 100% humidity is not condusive to epoxy work. So managed to tape half the inside of the boat. Tomorrow the other half of the inside after work I hope. Then we flip it and start taping the outside.

0 Comments:

Post a Comment

<< Home